top of page
About.jpg

PROJECTS

Administrative

Administrative

Elsewedy Technical academy
“Center of Excellence”

Location: Port-said

Owner: Elsewedy electric

Project Type: Administrative

Consultant: OKO PLAN

Duration : 8 months

Assignment:

Our assignment is all finishing works of area 600 m2 including facades finishes (stone, painting, Aluminum windows and structural glazing), marble pattern flooring, false ceilings , doors, and all roof layers finishes, also all electro-mechanical works (HVAC, electric, plumping)

Elsewedy Technical academy (4).jpg

New El-Marg Metro station

Location : Marg - Cairo

Owner : National authority of tunnels

Project Type : Administration

Consultant : Wassef Design Group

Assignment:

Our assignment was building / finishing works of two technical buildings and exten- sion of platform:

Rectifier station.

Signaling Building.

Platform 2 & 3 extension.

Including the next scope of works: • All Concrete and masonry works.

All types of finishing works including (epoxy flooring, raised floor, gypsum Ceilings, Ceramic, Granite & marble, doors/windows, metals, Painting, Plumbing, Electrical, HVAC Etc...).

Landscape and external works.

Picture1.jpg

Ministry of communications and information technology

Location: Smart Village

Owner: Ministry of communications and information technology

Project Type: Administration

Consultant: ECG

Duration : 10 months

Assignment:

Our assignment was building / finishing works of three main buildings:

• Data center.

•UPS Building.

•Utility building.

Including the next scope of works:

•All Concrete and masonry works.

•All types of finishing works

including (gypsum partitions/Ceilings, glass partitions, Epoxy flooring, raised floor,Ceramic, Granite & marble, doors, metals, Painting, Plumbing, Electrical Etc..)

•Landscape and external works.

WhatsApp Image 2022-09-26 at 12.37.12 PM (2).jpeg

UIC Factory

Location: 10th Ramadan

Owner: Elsewedy Cables

Project Type: Administration

Consultant : SA Architects

Duration : 10 months

Assignment:

Our assignment is all Renovation works of Admin building and all construction and finishing works of area 410 m2 of Locker building including facades finishes (stone, painting, Aluminum windows and structural glazing), marble pattern flooring, false ceilings, doors, and all roof layers finishes, also all electro-mechanical works (HVAC, electric, plumping)

IMG_20240325_125802.jpg